Company Details

  • Shenzhen Heng Yi Jia Technology Co., Ltd.

  •  [Guangdong,China]
  • Business Type:Manufacturer
  • Main Mark: Americas , Asia , Europe , Middle East , Worldwide , East Europe , North Europe , West Europe
  • Exporter:81% - 90%
  • Certs:ISO9001, ISO14001, GB, CE, MSDS, UL
  • Description:Powder Painting Coating Line,Coating Spray Line,Aluminum Coating Line
Inquiry Basket ( 0 )

Shenzhen Heng Yi Jia Technology Co., Ltd.

Powder Painting Coating Line,Coating Spray Line,Aluminum Coating Line

86-755-29492864

Home > Products > Powder Coating > Powder Coating Line > Automatic powder painting coating line

Automatic powder painting coating line

Share to:  
    Payment Type: T/T,Western Union
    Incoterm: FOB,CFR,CIF
    Min. Order: 1 Set/Sets
    Delivery Time: 45 Days

Basic Info

Model No.: HYJ-455

Type: Coating Production Line

Coating: Powder Coating

Substrate: Aluminum

Certification: CE, ISO

Condition: New

Coating Speed: PLC Programming, Frequency Conversion Control

Additional Info

Packaging: wood box

Productivity: 35

Brand: HENGYIJIA

Transportation: Ocean

Place of Origin: Shenzhen

Supply Ability: 7

Certificate: ISO,CE

Port: Shenzhen

Product Description

Product Description: Automated painting equipment to complete a one-time assembly line operations.
Equipment body size

1. Equipment length: 20m work area width of 15m
2. Working area: divided into three sections: one section: loading area, two sections: spraying area, three sections: baking area four sections: cooling discharge area
3 feeding operation area: 5000mm
4. Baking operation area: 8800mm
5. Baking area and cooling area spacing: 500 mm
6. Baking area: 8800mm
7. Cooling zone: 3000mm
8. Entrance height: 600mm-800mm
9. Entrance width: 450mm

Conveyor belt from the ground: 250mm (total height of the machine 1520 ± 30mm)
Equipment main structure
The main structure of 50 * 50 mm + a channel, no bad interface (nice).
Workspace Tunnel body: 1.2mm cold plate + paint closed cold-rolled steel
Work area Tunnel cavity: 1.0mm mirror steel Model: SUS316 #
Body support: Fang Tong a model: 50 * 50 "Fang Tong
Wind system: forced to carry 4 sets of wind fans
Insulation material: vacuum aluminum silicate + silk double type: 60K
Conveyor: track hanging
10. Balance device: ground screw
Electrical equipment part: (using PLC system automation control)
1. The main switch: 80.0A
2.Total power: 70.0KW
3. Transport motor: 750W (drive speed)
4. Forced circulation fan: HYJ-375w type
5. Cooling hair dryer: HYJ-100 type
6. Ammeter: 40A 4 sets
7. Voltmeter: 400V 1 set
8. Working voltage: 380V ± 5% three-phase five-wire system 50Hz

Drying part:
1. Liner a total of 4 sections of the furnace chamber, 2.2 meters each section of the furnace, combined into a total length of 8.8 meters;
2. Furnace cavity three sides shop 50㎜ high temperature insulation layer; Beam middle shop 60mm thick insulation layer;
3. Internal heat source installed on both sides, forced air circulation, the temperature uniformity control within ± 2.5 ℃;
4. Furnace chamber with control box, the use of Japan RKC temperature controller, the temperature RT ~ + 350 ℃ arbitrary adjustable, PID self-tuning function, automatic thermostat, with over-temperature power, over-temperature alarm, leakage protection and other functions ;
5. At the top of the furnace chamber equipped with wind motor, power 370W, with nine inches wind wind wheel;
6. Configure the control panel 1 set

Four: standard configuration
1. a product manual
2. a product warranty card
Fifth, safety devices
Overvoltage and overcurrent protection
2. Fault alarm prompts
3. Equipment overload protection
4. Emergency stop protection
5. Over-temperature prevention device (to protect the test object and test box)
6. Motor (blower) overload thermal relay (to protect the blower overload)
7. Protection of the motor phase loss circuit breaker
Six, warranty period description
1) In the normal use of equipment maintenance, machine warranty for 1 year, during the warranty period by the B is responsible for free warranty.
2) During the warranty period, the non-wearing parts in the unit are damaged or invalid under normal use, and Party B will be replaced free of charge.

3) During the warranty period, Party B shall be obliged to carry out repairs regardless of any breakdown or damage to the equipment provided. Party B shall send personnel to verify on site whether the components of the equipment are normally used or not, and written reports are issued on site Clarify the reasons and reasons. Confirmed by both parties. (Man-made damage to our company to charge the appropriate fees) If our engineers and technicians have sufficient reason to prove that man-made damage and Party A refused to sign, I Division have the right to refuse to perform the maintenance within the obligation. At the same time termination of warranty. Division I no longer bear any responsibility.

Curing OvenAutomatic Spray Painting Line For Spray BoothCell Phone Case For Spray Painting Line

Looking for ideal Powder Painting Coating Line Manufacturer & supplier ? We have a wide selection at great prices to help you get creative. All the Coating Spray Line are quality guaranteed. We are China Origin Factory of Aluminum Coating Line. If you have any question, please feel free to contact us.

Product Categories : Powder Coating > Powder Coating Line

Email to this supplier
  • *Subject:
  • *Messages:
    Your message must be between 20-8000 characters
Communicate with Supplier?Supplier
Demi Wu Ms. Demi Wu
What can I do for you?
Contact Supplier